Difference between revisions of "/tmp/order"

From Tmplab
(New page: =Intro= While doing interesting projects tools and material may end up in the wrong place. Adding to this missplacement of furniture you have a complete mess. The /tmp/order project is ab...)
 
Line 15: Line 15:
  
 
Placement maps are drawn in inkscape or other svg vector drawing tool.
 
Placement maps are drawn in inkscape or other svg vector drawing tool.
 
+
Before:
[[Image:before.svg]]
+
[[Image:Tmplab sketch before.svg]]
[[Image:after.svg]]
+
After:
 +
[[Image:Tmplab sketch after.svg]]

Revision as of 13:22, 28 April 2010

Intro

While doing interesting projects tools and material may end up in the wrong place. Adding to this missplacement of furniture you have a complete mess. The /tmp/order project is about designating storage for all tools and material and documenting the possition of furniture.

Pros

  • Possibility to revert back to a clean state after messing up.
  • Easier to find tools and material which give better turnaround time in your project.
  • Possibility to create space for new projects.

Cons

  • Unclean behaviour is more obvious.
  • Cleaning is not hacking etc.

Maps

Placement maps are drawn in inkscape or other svg vector drawing tool. Before:

Error creating thumbnail: File missing

After:

Error creating thumbnail: File missing